Jump to content
Create New...

Recommended Posts

Posted

To do high speed rail...we would need to fund the system adequately.

A recent estimate for a line between Milwaukee and Madison was $810 million....and that rate per mile...it would cost about eight or ten billion dollars just to put a basic system into Ohio. Not that I would mind spending the money...I'd spend it here rather than on another carrier group we are never going to use.

But we can''t just cough up 7 and a half billion dollars out of an already short Ohio treasury to do so.

Want to see what happens with the high speed trains on the coasts as this will get interesting.

Posted

I think we need to clarify our definition of Highspeed Rail.

79mph is not high speed rail... as such, I'm not sure how the Madison Milwaukee line qualified for funding.

79mph is actually fairly standard speed for most of Amtrak.

Posted

Here is the challenge..tell me how much it would cost to build an actual high speed rail system in Ohio if I handed you four hundred million dollars today...seriously....

Posted

Here is the challenge..tell me how much it would cost to build an actual high speed rail system in Ohio if I handed you four hundred million dollars today...seriously....

Far too many variables to give a serious answer.

Am I expanding an existing right of way?

Am I just rebuilding existing lines with welded rail and concrete ties?

Am I going for full electrification or will we be using the current diesel design?

Basic double track freight line is $1m per mile when starting from barren land.

Concrete ties add another $500k per mile

Electrification adds $5m per mile, but allows much higher top speeds

Bridges, tunnels, etc, add to cost substantially.... and since you can't have grade crossings with high speed rail, roads sometimes have to be moved or underpasses created.

When all is said and done, you're looking at $9m-$12m per mile electrified depending on terrain. As a point of reference, standard 4-lane highway is about the same per mile until you throw in interchanges. One interchange alone can be $30 million.

For $400m in Ohio, lets pretend we'll be using an abandoned right of way for a slight discount (there are lots) and we'll use diesel instead of electric and aim for an average cruise speed of 110mph. Cost per mile would probably be in the $4m - $8m range including bridges and such. Which means you'd get 50 to 100 miles for your $400 million.

However, $400 million was just what the feds were kicking in. Ohio was going to have to kick in money too.

Posted

Which is a huge part of the problem....Ohio is about and bankrupt as California right now...and sixty miles will go halfway to Cincinnati from Columbus...or not even....

Posted (edited)

:-P I still play it all the time

Cool... i was just messing around i have it too, but my harddrive... "blew a piston"(died) so not more save data...

Tycoon games own!

Edited by CanadianBacon94

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...

Hey there, we noticed you're using an ad-blocker. We're a small site that is supported by ads or subscriptions. We rely on these to pay for server costs and vehicle reviews.  Please consider whitelisting us in your ad-blocker, or if you really like what you see, you can pick up one of our subscriptions for just $1.75 a month or $15 a year. It may not seem like a lot, but it goes a long way to help support real, honest content, that isn't generated by an AI bot.

See you out there.

Drew
Editor-in-Chief

Write what you are looking for and press enter or click the search icon to begin your search