Jump to content
Create New...
  • William Maley
    William Maley

    Chicago Auto Show: Chevrolet Confirms Production Of Bolt EV

      The Chevrolet Bolt EV Will Soon Be Rolling Down An Assembly Line


    Last week, we brought you a report that said General Motors was going to send the Chevrolet Bolt into production by late 2016. Sources said the Bolt and a sister Opel model would be built at General Motors' Lake Orion assembly plant. Today at the Chicago Auto Show, GM North America President Alan Batey confirmed most of that report.

    “The message from consumers about the Bolt EV concept was clear and unequivocal: Build it,” said Batey. “We are moving quickly because of its potential to completely shake up the status quo for electric vehicles.”

    GM will be investing $160 million into Lake Orion to get it ready for Bolt production. The company will also invest $40 million for the Pontiac Metal Center for new dies.

    Details such as start of production and other details will be announced at a later date.

    Source: General Motors

    Press Release is on Page 2


    Chevrolet Commits to Bolt EV Production

    • Game-changing, long-range EV to be built at Orion Assembly facility in Michigan

    CHICAGO – Chevrolet this morning confirmed production of its next-generation pure electric vehicle, based on the Bolt EV concept. It will be built at General Motors’ Orion Assembly facility near Detroit.

    GM North America President Alan Batey made the announcement ahead of the Chicago Auto Show. The Bolt EV concept was introduced last month at the North American International Auto Show in Detroit.

    “The message from consumers about the Bolt EV concept was clear and unequivocal: Build it,” said Batey. “We are moving quickly because of its potential to completely shake up the status quo for electric vehicles.”

    Leveraging the industry-leading battery technology found in the Chevrolet Volt and Spark EV, the Bolt EV concept was developed as a game-changing, long-range pure electric for all 50 states, designed to offer more than a GM-estimated 200 miles of range at a target price of around $30,000.

    The progressively styled concept vehicle features selectable driving modes for preferred driving styles, such as daily commuting, and it was designed to support DC fast charging.

    “We’re proud that Chevrolet has decided to produce the Bolt EV here in Michigan at the Orion Assembly facility,” Gov. Rick Snyder said. “Michigan unquestionably remains the global automotive leader. Chevrolet is tapping a skilled workforce that includes some of the most talented and hard-working people in the world for this cutting-edge vehicle. Chevrolet is an important part of our state’s automotive history, and Michigan-made products like the Bolt EV point to a bright future as well.”

    Start of production and additional details will be announced later.

    $200-million investment

    GM’s Orion Assembly, home of the Chevrolet Sonic sub-compact and Buick Verano luxury compact, and Pontiac Metal Center facilities are receiving a $200-million investment to support production of the next-generation electric vehicle. Orion will receive $160 million for tooling and equipment, and Pontiac will receive $40 million for new dies.

    “As one of the most environmentally progressive facilities in GM’s global network, Orion Assembly is uniquely suited to build this game-changing electric vehicle,” said Doug Hanly, Orion Assembly and Pontiac Metal Center plant manager. “In partnership with UAW Locals 5960 and 653, we’re committed to building the highest level of quality into it.”

    Located approximately 30 miles north of Detroit, Orion Assembly is powered by gas from two nearby landfills, which saves more than 6,300 tons of CO2 from entering the atmosphere annually. It is also home to a 350-kilowatt solar array that produces the energy equivalent to power 165 homes and sends enough energy back to the grid to power about 45 homes.

    “This is very exciting for our members who were facing the possibility of losing that plant during the auto crisis,” said UAW Vice President Cindy Estrada, director of the union’s GM Department. “Our members are also proud to have their plant chosen to produce what is sure to be another popular and dynamic Chevy product rolling off the line at the Orion Assembly Plant.”

    User Feedback

    Recommended Comments



    Join the conversation

    You can post now and register later. If you have an account, sign in now to post with your account.
    Note: Your post will require moderator approval before it will be visible.

    Guest
    Add a comment...

    ×   Pasted as rich text.   Paste as plain text instead

      Only 75 emoji are allowed.

    ×   Your link has been automatically embedded.   Display as a link instead

    ×   Your previous content has been restored.   Clear editor

    ×   You cannot paste images directly. Upload or insert images from URL.


  • google-news-icon.png



×
×
  • Create New...

Hey there, we noticed you're using an ad-blocker. We're a small site that is supported by ads or subscriptions. We rely on these to pay for server costs and vehicle reviews.  Please consider whitelisting us in your ad-blocker, or if you really like what you see, you can pick up one of our subscriptions for just $1.75 a month or $15 a year. It may not seem like a lot, but it goes a long way to help support real, honest content, that isn't generated by an AI bot.

See you out there.

Drew
Editor-in-Chief

Write what you are looking for and press enter or click the search icon to begin your search